Palisades Fire Recovery: How AkinsIT Reconnected a Displaced School in 3 Weeks

List of Services
-
Client Overview
When wildfires swept through Pacific Palisades, California, Palisades Charter High School (PCHS) faced a devastating loss: its Main Distribution Frame (MDF) was destroyed, leaving the school without internet, internal communications, or digital learning capabilities. With students displaced and the school relocating to a temporary Sears building in Santa Monica, the urgency to restore connectivity was paramount. AkinsIT was called in to execute a full network rebuild — under extreme time pressure and in an entirely new location.
-
School Challenge
The Crisis
The wildfire damage triggered a full-scale infrastructure emergency:
- Complete loss of firewall, switches, and access points
- No internet or internal communications, halting digital learning and administrative operations
- Severe infrastructure damage left the school disconnected, despite existing backups — core systems were physically destroyed, rendering recovery impossible without a full rebuild
- Urgent relocation to a temporary site, requiring a complete network deployment from the ground up
With many students having lost their homes, restoring connectivity wasn’t just about education — it was about restoring normalcy.
-
SolutionList Item 1
AkinsIT’s Rapid Response
AkinsIT mobilized immediately:
- Emergency Site Assessment: Conducted within hours to evaluate damage and define recovery priorities
- Expedited Procurement: Critical hardware sourced and configured on an accelerated timeline
- Accelerated Deployment: Installation teams worked extended hours to restore core infrastructure at the new site
Solution Delivered
AkinsIT implemented a full network rebuild:
- Firewall: A next-gen firewall restored secure access and protected sensitive data
- Switches: High-performance switches re-established backbone connectivity
- Access Points: A new fleet of access points ensured reliable Wi-Fi across classrooms, offices, and outdoor areas
-
OutcomeList Item 3
Results
Connectivity Restored in Less Than 3 Weeks: Despite the scale of damage and relocation, AkinsIT completed the full deployment in under 21 days — minimizing disruption to learning and operations
Enhanced Security & Resilience: The new infrastructure included fire-resistant housing and disaster recovery protocols
Future-Ready Network: The scalable design supports smart classrooms, cloud-based learning, and future expansion — even beyond the temporary site
Client Feedback
PCHS administrators praised AkinsIT for their speed, professionalism, and technical excellence, noting that the team delivered a robust solution under intense pressure and tight deadlines.